Shipyard Projects

New ship repair yard, including two large dry docks with the third recently opened for business. All yard facilities including equipment, infrastructure, administration etc.

Two new ship repair yards recently completed, including a total of five floating docks with mooring dolphins, access bridges, access jetties and repair quays.

Design of cantilever tube moorings for two floating docks in another Singapore yard.

Two new or developing shipyards, one involving moorings for floating docks, together with quays and all infrastructure, the other for a slipway for vessels up to 6,000 dwt, currently in hand with site investigation, hydrographic surveys etc, in progress.

World's largest dry dock with 131m entrance. Dock floor, entrance works, main and intermediate gates, pumphouse and pumping system. 60,000m² steelworking facilities for prefabrication and assembly of units up to 250 tonne under cover.

Advice was given on other aspects of project, together with design of main and intermediate gates and support structures for second 80m wide dry dock.

Page 2 of 3

Next